§ 8.41.090. Onsite wastewater treatment system—Construction permit required.  


Latest version.
  • No person shall construct, repair, expand, modify, or abandon an onsite wastewater treatment system without a valid OWTS construction permit from the director. The permit, once issued, shall be valid for a period of two years.

( Ord. No. 2017-02, § I, 7-25-2017 )